OLD >
Announcements Winter 2012
Post-Poster Deliverables
Congratulations on an Excellent Poster Session!
Complete the Peer Review by Wed. 3/12/2012 midnight.Upload One Selected Photo and Team Names
Check Webpage For:
|
Final Details and Logistics
Report Turn-In for Section A00 to Dr. Delson
Poster Day - Wednesday March 21, 2012
Webpage Details
Peer Review
Day after Posters - Thursday March 21, 2012
|
10th Week Section B Meetings
Please be on time. These are very short meetings and it's easy to get off schedule. I will bring your draft posters today. 1:00 - Team 12 (Wind Click) Steve Roberts Lab 1:15 - Team 13 (Buoy Cam) Machine Shop 1:30 - Team 10 (TIM) Steve Roberts 1:45 - Team 14 (Seepage Flow) Across from design studio 2:00 - TEam 15 (Segway) Across from design studio 2:15 - TEam 16 (viacyte) Across from design studio 2:30 - TEam 17 (snowcam) Across from design studio 2:45 - Team 18 (Geo Pump) Warren 2214 Please call my cell this morning if you have any questions. 818 518 7557 -Greg |
A quick word on posters
Use PowerPoint and make the dimensions 42x36 inches. You can use this poster as a template.
Try to use bullets over excessive amounts of text, this is a poster not
a written report! Have the rough draft of your poster available on your
website by midnight on Friday of 9th week. Mike and I will bring a quarter-scale version of your poster to the 10th week meetings. You'll get a chance to see what your poster will look like and get feedback before your final draft is printed. This is the opportunity to use your best CAD. Do not use graphics where sketch planes and other such things are visible. Since you will be using a white background on your poster, it is strong recommended your graphics either have a white background or transparent background to blend seamlessly into the rest of the poster. -Greg |
2nd draft due section A00 team grading scheme
Hey all. The 2nd draft of your report is due right now. Midnight on Friday March 2nd. This draft needs to be graded by each member of another team in your section. And vice versa. See the report 2 guidelines and it will highlight the fact that each member grading another report should use a different color and make comments visible and clear. The arrangement of which teams will grade which reports is listed below. If you have questions please let me know. Email your reports directly to the other team, not myself or Dr Delson. Team 1 --> team 9 Team 2 --> team 8 Team 3 --> team 7 Team 4 --> team 6 Team 5 --> team 1 Team 6 --> team 2 Team 7 --> team 5 Team 8 --> team 4 Team 9 --> team 3 This grading should be done over the weekend and completed by Tuesday at the latest. Please print out a hard copy and do not grade this electronically. Have a great weekend (however you manage that) everyone! Mike Morris m10morris10@gmail.com |
Section A00 Wednesday meeting for 2/22 changed
Hello all, Please see the proper link for "Group 1 and 2 meetings" or just look below to see the updated meeting times. The meetings each had to be shortened to 20 minutes each which I don't think anyone will complain about. Professor Delson has a previous obligation which has him unavailable after 4pm so please make your best effort to have all your team at the new meeting time. These meetings will be at your normal workspace, so please let me know if you are in an odd or not normal work place. 12:30pm-12:50pm Team 8 UCSD-Ski-Friction-Tester 12:50pm-1:10pm Team 6 UCSD-Cell-Robot 1:10pm-1:30pm Team 5 *SPAWAR-Robotically-Controlled-ATV 1:30pm-1:50pm Team 1 *Delta_Rasco_low_g-gyro 1:50pm-2:10pm Team 9 UCSD-Skin-to-Skin 2:10pm-2:30pm Team 4 *Linkabit-Obscuration-Turbine-Exhaust 2:30pm-2:50pm Team 2 *DJO-Knee-Cycle-Tester 2:50pm-3:10pm Team 7 UCSD-Magnetic-Freezing 3:10pm-3:30pm Team 3 *ECOLIFE-Charcoal-creation Pass along this information to other teammates who might not check this website (or their email) in time! See you all tomorrow and of course don't hesitate to contact me if you have questions or run into problems at any time along the way. ~Mike Morris 805-341-4471 m10morris10@gmail.com |
Updated Report Template
The Report Template has been updated:
You can use the old template if you already started with it, but you may want to look at the new one for formatting tips. |
Extended Machine Shop Hours!
We hired a new machinist and now can offer evening and weekend machine shop hours:
Stop by and introduce yourself to Jack! |
A00 Schedule Update
Please Review the Following Items that have also been Updated on the Schedule for A00
|
1-10 of 14